Port Maria Fire Station construction (Amended)

The scope of works includes but is not limited to the construction of a new fire station comprising three (3) single storey structures housing fire- fighting equipment, engine bays, dormitories, administrative and training facilities. In addition to meeting the building code the facility will be constructed to (1) withstand the multitude of natural disasters, particularly storm surge. (2) to be as energy efficient as possible. The building is of reinforced concrete column and beam construction. Construction period is Twelve (12) Months.

Bid Number: 
8114
Collection Period: 
Monday, December 17, 2018 - 8:30am to Thursday, January 17, 2019 - 11:00am