INTEGRATED NETWORK INFRASTRUCTURE
Roads
Approximately 4100m (2.5 miles) of road reinstatement is proposed to repair any trench excavated.
Street lighting & household connection
New streetlights will replace dysfunctional ones as agreed with the Parish Council. The Project will work with the Rural Electrification Programme (REP) and the Jamaica Public Service Company Limited (JPSCo) to encourage householders to regularize illegal electricity connections.
Sewage Treatment & Sanitation
There is proposed for this project construction of eight (8) no. 4.13m x 2.5m x 3.0m high sanitary cores. There will be the laying of approx 4150m (2.6 miles) of sewer pipes of varying diameter from 100 (4") to 200 (8").
Storm Water Management
There are approximately 600m3 (800yd3) or 50 NSWMA tipper trucks of sludge and impediments to the free flowing of drains to be removed. Localised repairs and some new construction to approximately 350m (1150ft) of 600 x 600mm are also proposed for storm water management.
Solid Waste
JISF will procure for use by the NSWMA or local service providers that have entered into service contracts with NSWMA, compactor trucks to operate waste collection systems in Kingston and St. Andrew including Passmore Town. Six (6) garbage receptacles will be installed at strategic locations within the community as agreed with the NSWMA and the community.
Neighbourhood Improvement
Under the beautification programme improvements to or creation of green spaces as agreed with the community. It is also proposed to remove and replace zinc fences with block wall. The issue of zinc removal is a sensitive one and will require the full cooperation of the community to realize success.